Celestica
60% of offtaker’s global electricity consumption are supplied by renewable energy
- 2.9 MW
- Rooftop
- Malaysia
- Over 8,000 combined solar panels were installed across two facilities.
- 95,400 MWh of renewable energy generated over 15 years.
- The project overcame significant technical challenges by meeting the Airport Authority's stringent requirements and conducted glare analysis, a huge achievement for both teams.