Wanda Plaza BESS
Wanda Group’s first 2MW/4MWh energy storage project
- BESS
- Grid Connected
- Shenzhen
- The advantages of behind-the-meter / user-side energy storage include peak-valley arbitrage, increased backup power capacity, reduced costs, and improved efficiency.
- The project is dedicated to creating a one-stop green shopping center integrating PV, energy storage, and EV charging stations, providing shoppers with a convenient and sustainable shopping experience.
- Located in the northeast of Wanda Plaza in Longgang District, Shenzhen.