Bosch BESS
Bosch’s first global energy storage project
- BESS
- Grid Connected
- Nanjing
- The project has an installed capacity of 2 MW / 4 MWh and utilizes an integrated liquid-cooled cabinet for industrial and commercial energy storage.
- Saves 8,000 kWh of electricity daily and reduces electricity costs.
- Integrated with Bosch's existing PV project to increase PV utilization and the factory's green electricity usage ratio.